Dataset Viewer
Auto-converted to Parquet
file_name
stringclasses
2 values
page
int64
7
235
query
stringlengths
86
208
image
imagewidth (px)
575
1.22k
Examinig_ORION_CREW_CAPSULE.pdf
7
What are the key over-arching questions the Subcommittee is examining regarding the Space Launch System (SLS) and Orion Crew Capsule?
Examinig_ORION_CREW_CAPSULE.pdf
8
What is the historical context and legislative mandate behind the development of the Space Launch System (SLS) and Orion crew capsule?
Examinig_ORION_CREW_CAPSULE.pdf
9
What are the key technical features and current development status of the Orion Multipurpose Crew Capsule?
Examinig_ORION_CREW_CAPSULE.pdf
10
What are the key technical features and specifications of the Space Launch System (SLS), including its propulsion systems and planned upgrades?
Examinig_ORION_CREW_CAPSULE.pdf
11
What is the status of the J-2X engine development and the advanced booster program for the SLS?
Examinig_ORION_CREW_CAPSULE.pdf
12
How does the Space Launch System (SLS) enable future scientific missions, and what are the key findings from the National Academy of Sciences report on this topic?
Examinig_ORION_CREW_CAPSULE.pdf
31
What are the key technical objectives of the Exploration Flight Test-1 (EFT-1) mission, and what specific performance capabilities will it demonstrate?
Examinig_ORION_CREW_CAPSULE.pdf
33
What are the primary technical challenges associated with the development of the Space Launch System (SLS), and how is Boeing addressing these challenges, particularly concerning the core stage?
Examinig_ORION_CREW_CAPSULE.pdf
34
How is Boeing mitigating the risks associated with the SLS program, and what specific examples are provided?
Examinig_ORION_CREW_CAPSULE.pdf
36
What are the three key elements of NASA's path forward for human spaceflight and space exploration, as outlined in the provided document?
Examinig_ORION_CREW_CAPSULE.pdf
37
What are the specific integration challenges associated with combining the existing elements of the SLS with the new core stage design?
Examinig_ORION_CREW_CAPSULE.pdf
38
How does the flat budget profile influence the development of the SLS, and what are the implications of this for the program's evolution?
Examinig_ORION_CREW_CAPSULE.pdf
39
What is the Boeing approach to maximize production and operations efficiency during the design and development phase of the SLS?
Examinig_ORION_CREW_CAPSULE.pdf
40
What are the key milestones and progress made in the development of the SLS core stage, including manufacturing and avionics?
Examinig_ORION_CREW_CAPSULE.pdf
43
How can the Space Launch System (SLS) enable new possibilities for space science, and what specific examples are provided?
Examinig_ORION_CREW_CAPSULE.pdf
44
What are the key characteristics of the SLS that enable ambitious scientific missions?
Examinig_ORION_CREW_CAPSULE.pdf
61
What are the key challenges in maintaining progress on the Orion and SLS architectures, and what is needed to address those challenges, as identified by Mr. Dumbacher?
Examinig_ORION_CREW_CAPSULE.pdf
62
According to Mr. Lacefield, what is the most significant challenge facing the Orion program's supply chain, and what specific examples are provided to illustrate this challenge?
Examinig_ORION_CREW_CAPSULE.pdf
67
Question 7 from Mr. Dumbacher's post-hearing questions asks about the service module for the EM-1 test flight. What is the question, and what is the technical risk associated with the service module?
Examinig_ORION_CREW_CAPSULE.pdf
68
What is the rationale behind NASA's decision to pursue an advanced booster competition and development, as posed in Question 1 from Rep. Costello, and what are the implications for the upper stage engine?
Examinig_ORION_CREW_CAPSULE.pdf
69
What are the potential destinations that the SLS and Orion can reach, and how does the payload capacity change with different SLS configurations, as outlined in Rep. Rohrabacher's questions?
Examinig_ORION_CREW_CAPSULE.pdf
72
According to Mr. Lacefield's response to Rep. Costello's question, what are the most significant safety challenges facing Orion?
Examinig_ORION_CREW_CAPSULE.pdf
73
What actions does Mr. Lacefield believe are needed to address the fragility of the supply chain in the US, and what factors contribute to this fragility?
Examinig_ORION_CREW_CAPSULE.pdf
76
According to Mr. Chilton, what are the key safety features of the SLS design, and how does the program leverage heritage hardware to ensure safety?
Examinig_ORION_CREW_CAPSULE.pdf
77
What are the key trade-offs that must be considered when deciding on the upper stage propulsion and advanced boosters for the SLS evolution, according to Mr. Chilton?
Ariane-5-Users-Manual-2000.pdf
8
What are the key performance characteristics of the Ariane 5G launch vehicle, specifically concerning Geosynchronous Transfer Orbit (GTO) missions?
Ariane-5-Users-Manual-2000.pdf
9
What are the performance characteristics of the Ariane 5 ES launch vehicle for various orbit types, including Low Earth Orbit (LEO), High Elliptical Orbit (HEO), Medium Earth Orbit (MEO), and Escape missions?
Ariane-5-Users-Manual-2000.pdf
10
What are the key electrical interfaces and services provided at the base of the spacecraft adaptor for Ariane 5 launches?
Ariane-5-Users-Manual-2000.pdf
11
What are the key phases and activities involved in the spacecraft field operations and planning for an Ariane 5 launch?
Ariane-5-Users-Manual-2000.pdf
61
What is the integrated acoustic vibration level at lift-off for the Ariane 5, and what is the reference pressure used for its measurement?
Ariane-5-Users-Manual-2000.pdf
62
Describe the shock environment experienced by the spacecraft during separation events on the Ariane 5, and what are the key frequencies and g-levels at the spacecraft separation interface?
Ariane-5-Users-Manual-2000.pdf
64
What are the three phases of the thermal environment that must be considered for the spacecraft, and what are the key specifications for the air-conditioning system provided during the pre-launch phase?
Ariane-5-Users-Manual-2000.pdf
66
What is the maximum aerothermal flux allowed on the fairing during the standard Ariane 5 G and ES trajectory, and what is the typical profile of the aerothermal flux over time?
Ariane-5-Users-Manual-2000.pdf
67
What is the maximum aerothermal flux allowed on the fairing during the standard Ariane 5 ECA trajectory, and what is the typical profile of the aerothermal flux over time?
Ariane-5-Users-Manual-2000.pdf
68
What is the maximum organic contamination generated in the clean rooms of the BAF and EPCU buildings, and what are the limits for organic deposits on the spacecraft from encapsulation to separation?
Ariane-5-Users-Manual-2000.pdf
70
What are the key characteristics of the telemetry system, telecommand-destruct reception system, and radar transponder system used on the Ariane 5 launch vehicle?
Ariane-5-Users-Manual-2000.pdf
74
Describe the different payload compartment configurations available for the Ariane 5, including the fairing, SPELTRA, and SYLDA 5, and how the separation of each is achieved.
Ariane-5-Users-Manual-2000.pdf
78
What are the standard Ariane adaptors available for spacecraft mounting, and what is the diameter and hole configuration of the 2624 mm and 3936 mm bolted interfaces?
Ariane-5-Users-Manual-2000.pdf
82
What are the key geometric characteristic symbols used in the document, and what is the maximum surface roughness value specified?
Ariane-5-Users-Manual-2000.pdf
83
What is the required earth-potential continuity specification for the spacecraft, and what are the electrical services available at the base of the spacecraft adaptor?
Ariane-5-Users-Manual-2000.pdf
85
What is the number of wires available in the umbilical link, and what are the key electrical characteristics and operating constraints of the umbilical link and separation command?
Ariane-5-Users-Manual-2000.pdf
86
What are the main electrical characteristics of the pyrotechnic commands, and what are the requirements for the user's protection of the circuits?
Ariane-5-Users-Manual-2000.pdf
87
What are the main electrical characteristics of the dry-loop commands, and what are the protection requirements for the user?
Ariane-5-Users-Manual-2000.pdf
88
What are the main electrical characteristics of the electrical commands, and what are the utilization constraints for the user?
Ariane-5-Users-Manual-2000.pdf
92
What are the total mass loss (TML) and collected volatile condensable material (CVCM) criteria for spacecraft materials, and what is the reference procedure for measurement?
Ariane-5-Users-Manual-2000.pdf
92
What are the static unbalance limits for spun-up and three-axis stabilized spacecraft, and how do they relate to spacecraft mass?
Ariane-5-Users-Manual-2000.pdf
92
What is the maximum dynamic imbalance allowed for spacecraft requiring spin-up, and how is it related to the angular transverse rate after separation?
Ariane-5-Users-Manual-2000.pdf
92
What are the lateral and longitudinal fundamental frequency requirements for spacecraft, and how do they vary depending on whether the user or Ariane adaptor is used?
Ariane-5-Users-Manual-2000.pdf
93
What are the critical flight events that determine the quasistatic loads (QSL) for spacecraft design, and what are the corresponding flight limit loads for each event?
Ariane-5-Users-Manual-2000.pdf
94
What safety factors are required by Arianespace for dimensioning spacecraft structures, and what is the approach for designing secondary structures and flexible elements?
Ariane-5-Users-Manual-2000.pdf
94
What is the maximum allowable line load induced by the spacecraft at the spacecraft/adaptor interface, and what is the impact of non-uniform thrust transmission on line loads?
Ariane-5-Users-Manual-2000.pdf
94
What are the three approaches for spacecraft structural qualification and acceptance tests, and what tests are included in each approach?
Ariane-5-Users-Manual-2000.pdf
95
What is the minimum safety factor to be applied during static qualification tests, and how is it determined?
Ariane-5-Users-Manual-2000.pdf
96
What are the qualification and acceptance levels for sinusoidal vibration tests in the longitudinal and lateral axes, including frequency ranges and displacement/acceleration levels?
Ariane-5-Users-Manual-2000.pdf
96
What are the qualification and acceptance acoustic vibration test levels for each octave band center frequency?
Ariane-5-Users-Manual-2000.pdf
97
How is the fill factor of a spacecraft considered during acoustic vibration testing, and what are the correction factors applied?
Ariane-5-Users-Manual-2000.pdf
97
Describe the process for demonstrating a spacecraft's ability to withstand shock, including the two-step approach and the tests involved.
Ariane-5-Users-Manual-2000.pdf
97
What interface tests can be arranged at the user's request, and what hardware is provided for each test?
Ariane-5-Users-Manual-2000.pdf
99
What are the telecommand constraints during the powered phase of the launch vehicle and after spacecraft separation?
Ariane-5-Users-Manual-2000.pdf
101
What are the three phases of spacecraft operations at the CSG, and where do these operations take place?
Ariane-5-Users-Manual-2000.pdf
101
What is the maximum duration of the spacecraft campaign, from equipment arrival to departure, and what is the typical operations schedule?
Ariane-5-Users-Manual-2000.pdf
107
Where are the spacecraft hazardous operations carried out, and what is the role of the S3C building in these operations?
Ariane-5-Users-Manual-2000.pdf
107
Describe the process for preparing and handling solid propellant motors (SPMs) during Phase 2 operations.
Ariane-5-Users-Manual-2000.pdf
110
What is the earliest time the spacecraft can be transported to the S3 building, and what equipment is used for monitoring and controlling the spacecraft in S3?
Ariane-5-Users-Manual-2000.pdf
121
Referring to Figure 5.4.3.11.c, describe the spacecraft remote control configuration for combined operations, including the roles of OCOE and COTE, and the data flow.
Ariane-5-Users-Manual-2000.pdf
122
Describe the typical flow diagram (J-3 to J0) for the Ariane 5 launch operations, as depicted in Figure 5.4.3.11.d, including the key activities and timelines.
Ariane-5-Users-Manual-2000.pdf
123
Based on Figure 5.4.3.11.e, explain the principle of spacecraft/launch pad interfaces, including the role of the CMCU, RCU, and the data links.
Ariane-5-Users-Manual-2000.pdf
125
Describe the responsibilities of the key personnel involved in Ariane 5 launch operations, as defined in section 5.5, focusing on the roles of DMS, CPS, RPS, RCUA, CM, and COEL.
Ariane-5-Users-Manual-2000.pdf
126
Based on Figure 5.5.a, describe the typical operational countdown organization, including the flow of information and authorization.
Ariane-5-Users-Manual-2000.pdf
128
Define the key terms related to launch windows, as described in section 5.6.1.1, and explain the procedure for dual GTO launches (5.6.1.2) and the constraints (5.6.1.3).
Ariane-5-Users-Manual-2000.pdf
131
Describe the documentation system associated with an Ariane mission, as outlined in Chapter 6, including the typical mission integration schedule and the role of the DUA and DCI.
Ariane-5-Users-Manual-2000.pdf
133
Explain the safety baseline documents and submission procedure, as described in section 6.3, including the three phases of submission and the topics covered in the safety check list.
Ariane-5-Users-Manual-2000.pdf
136
Describe the Preliminary and Final Mission Analyses (6.4.2 and 6.4.3), including the studies performed in each stage.
Ariane-5-Users-Manual-2000.pdf
137
What are the requirements for the spacecraft environment test file, payload mass characteristics, and post-launch documents (6.4.4, 6.4.5, and 6.4.6)?
Ariane-5-Users-Manual-2000.pdf
152
What specific information is required in the 'SPACECRAFT description and mission summary' section of the Ariane 5 application format, and what are the key parameters that need to be specified?
Ariane-5-Users-Manual-2000.pdf
153
Describe the requirements for specifying the launch window(s) and separation conditions, including the inertial reference frame and orientation definitions.
Ariane-5-Users-Manual-2000.pdf
154
What are the requirements for spacecraft geometry and mass properties data submission in the application format?
Ariane-5-Users-Manual-2000.pdf
155
What specific data is required in the table format for mass properties, and what are the associated notes and constraints?
Ariane-5-Users-Manual-2000.pdf
156
What propellant and pressurant characteristics must be provided in the application, and what specific parameters are required for each?
Ariane-5-Users-Manual-2000.pdf
157
Detail the requirements for mechanical interface specifications, differentiating between spacecraft using Ariane-supplied adaptors and those providing their own.
Ariane-5-Users-Manual-2000.pdf
158
What are the requirements for specifying electrical interfaces, including umbilical connectors and data links?
Ariane-5-Users-Manual-2000.pdf
159
What are the requirements for radioelectrical interfaces, including antenna diagrams and spacecraft transmission plans?
Ariane-5-Users-Manual-2000.pdf
162
What are the requirements for the 'Safety Submission' phase 1, and what specific information is needed for electro-pyrotechnic devices?
Ariane-5-Users-Manual-2000.pdf
164
Describe the spacecraft accessibility requirements, including access door dimensions and placement constraints within the fairing, SYLDA 5, and SPELTRA.
Ariane-5-Users-Manual-2000.pdf
171
Describe the usable volume available to the payload under the fairing, SPELTRA, and SYLDA 5, and how it is defined.
Ariane-5-Users-Manual-2000.pdf
175
Describe the characteristics of the 937V5 adaptor, including its dimensions, mass, separation mechanism, and spring forces.
Ariane-5-Users-Manual-2000.pdf
184
What are the key mechanical features and separation mechanisms of the 937VB5 adaptor, including the clampband, springs, and umbilical connectors?
Ariane-5-Users-Manual-2000.pdf
193
Describe the mechanical design and separation system of the 1194V5 adaptor, focusing on the clampband, separation actuators, and material requirements.
Ariane-5-Users-Manual-2000.pdf
202
Detail the design and operation of the 1194H adaptor, including the clampband design, thermal management during clampband installation, and separation mechanism.
Ariane-5-Users-Manual-2000.pdf
203
What are the specific features of the 1194H clampband design as illustrated in Figure A8.2-1?
Ariane-5-Users-Manual-2000.pdf
211
What is the primary function of the 1663SP5 adaptor, and what are the key components involved in the spacecraft separation mechanism?
Ariane-5-Users-Manual-2000.pdf
219
Describe the spacecraft separation mechanism and the force application method used by the 1666V5 adaptor.
Ariane-5-Users-Manual-2000.pdf
227
Detail the spacecraft separation system and the role of the clampband in the 2624 adaptor.
Ariane-5-Users-Manual-2000.pdf
235
What are the two main dispenser designs proposed by Arianespace, and how do they accommodate multiple payloads?
README.md exists but content is empty.
Downloads last month
5